Circuit Breaker Tripping Characteristics Comprehensive Testing Machine 3 Stations IEC60898-1
Products Description
                     
 Circuit Breaker Tripping Characteristics Comprehensive Testing Machine 3 Stations IEC60898-1 
   
 Product Information: 
   
 The test equipment is designed and manufactured according to the standard requirements of 
 IEC60898-1 clause 9.1, 9.8, 9.9 and 9.10, IEC60947-1 clause 7.2.1 and etc. 
 It is made to verify that the circuit-breaker complies with the requirements, which apply 1.13 times, 1.45 times, and 2.55 times the rated current to test to see if it trips within the specified time. The test equipment can also test the instantaneous tripping characteristics of the circuit breaker, that is, apply 3 to 20 times the rated current for the test whether it jumps out of the time. Also meets standard 28-day test requirements. 
   
 It is suitable for online testing of molded case circuit breakers and miniature circuit breakers before leaving the factory. It is a necessary equipment for electrical performance testing of circuit breaker manufacturers. 
   
 Technical parameters: 
   
 1. Delay test of miniature circuit breaker 
 2. Instantaneous test of miniature circuit breaker 
 3. Temperature rise test of miniature circuit breaker 
 4. 28-day test of miniature circuit breaker 
 3 separate isolated chambers 
 Chamber 1 is: 
 1 delayed tripping station 1.13+1.45In; 2.55In 
 1 instantaneous tripping station 3-20In 
 1 station testing "28 days" 
 1 station testing temperature rise 
   
 Chambers 2 and 3. Each chamber includes: 
 1 delayed tripping station 1.13+1.45In; 2.55In 
 1 station testing "28 days" 
 1 station testing temperature rise 
 1. Whether the circuit breaker tripped during the test or not. If it tripped, it failed; if it did not trip, it passed. 
 2. Temperature rise comparison, if it exceeds the standard value by 15K, it is defective; if it does not exceed the standard value, it is acceptable. 
 3. After the current rises to the tripping current, if it trips within the given/preset time, it is acceptable; if it exceeds the given/preset time or does not trip, it is defective. 
 3 pcs, for heating the chamber to (RT+5~50°C) 
 heating the chamber to (RT+5~50°C) 
 3 heating elements in each chamber. 
 Control system for setting and maintaining temperature for each chamber. 
 3 regulators are installed on the control panel. 
 Equipment characteristics: 
 The equipment chamber is welded with high-quality steel, the plate is coated and sealed, and the surface is anti-static, anti-rust, and anti-corrosion coated. The upper part of the equipment is equipped with a panel, a power switch, and a variety of wire ends (for delay tripping test). The equipment is reasonably designed and used with the advantages of convenience, simple operation, reliable performance and beautiful appearance. 
   
 According to the delayed tripping of standard IEC60898-1 clause 9.10.2.1 or 9.10.2.2, the three chambers in SN2501-3C can be tested independently at the same time. According to the instantaneous test of IEC60898-1 clause 9.10.3.2-9.10.3.4, it can only be tested in chamber 1. 
   
   
 Chamber 1, Chamber 2, and Chamber 3 are independent and can be freely combined for testing. 
 Note: The delay and instant of box 1 cannot be tested at the same time. 
 Chamber 1 instantaneous trip test and 28-day test cannot be performed at the same time. 
   
 Temperature rise and 28-day test procedure compatibility 
   
   
 The temperature rise test and the 28-day test are compatible with each other to and can be performed simultaneously within each chamber and also can be performed independently in different chambers. 
 Testing can be carried out both simultaneously and at different times relative to other cameras chambers. 
 In different chambers can be carried out simultaneously and independently different types of tests from those provided. 
 Each chamber is equipped with a heating device, with a temperature control range of RT+5~50°C, so that the model samples in the chamber can be used at normal ambient temperatures, and includes a three-way ambient temperature monitoring function. 
 The software must allow the execution of any test program to be terminated at any time without having to wait for the standard procedure to complete, retaining the results obtained at the time of termination. 
   
 Test principle: 
 This test equipment adopts the principle of low voltage and high current output, uses the large current in the machine to isolate the output current of the transformer, sets the current size through the touch screen, and the constant current source adjusts the size of the output current of the transformer, which has the function of automatically stabilizing the current. Set the test time through the touch screen display and compare the test trip time to judge the quality of the circuit breaker. 
   
 
   
 
   
 
   
   
              
 
Project specifications 
Parameter content 
 
Applied standard 
IEC 60898-1 
 
Clause 
9.1, 9.8, 9.9, 9.10 
 
Control method 
18.5-inch touch-screen computer operation 
 
Program language 
Russian (provided by client translation) 
 
Test items 
 
 
Test station 
 
 
Input power 
AC380V 50Hz 40kVA 
 
Delay trip parameters 
 
Output AC current 
0.35~200A 
 
Output AC voltage 
1-5V 
 
Output current channel 
3-channel, multi-P circuit breaker contacts are connected in series to test several switches at the same time (max. 3 pcs.) 
 
Test miniature circuit breaker products 
0.5~63A 
 
Current output waveform 
Sine wave (correction equipment current waveform distortion is not more than 5%, system error is not more than 3%) 
 
Current control method 
Automatic adjustment, the current is set on the touch screen 
 
Current accuracy 
Level 0.5 
 
Voltage accuracy 
Level 0.5 
 
Transformer ratio 
200/5A 
 
Test time 
1~999999s 
 
Current 
After 1.13 times of current is applied, it quickly and automatically rises to 1.45 times of current in 5 seconds 
 
Fixture 
Adopt the terminal method, delayed: one station, instantaneous: one station. 
 
Instantaneous trip test 
 
Fixture 
Adopt the terminal method, delayed: three stations, instantaneous: one station. 
 
Output current 
AC3A~1500A 
 
Instantaneous tripping currents 
3-20 In 
 
Output voltage 
1-5V 
 
Output current channels 
1 channel 
 
Current accuracy 
0.5 level 
 
Resolution 
≥0.1A 
 
Instantaneous test time 
≤0.2s 
 
Action time upper limit setting 
1~200ms 
 
Action time lower limit setting 
1~200ms 
 
Test station 
1 station 
 
Timing time 
1~9999ms 
 
Protective function: 
Short circuit protection, overload protection, leakage protection 
 
Temperature rise test 
Under normal working conditions, when the circuit breaker is tested according to the specified conditions. The circuit breaker should not be damaged to affect its function or safety of use. 
 
Temperature measurement channel 
32channels, temperature resolution: 0.1 degrees, 10 channels per chambers (two channels measure the ambient temperature inside the chamber), 2 spare temperature channels 
 
Thermocouple 
T type or K type 
 
Current 
0.5~63A 
 
Voltage 
AC 30V 
 
Testing time 
0-9999 hours 
 
Temperature curve 
Computer display with temperature data logging table 
 
Temperature measurement range 
0~200 degrees 
 
28-day test 
 
Test program 
The sample is supplied with AC 30V and rated current, the power-on time is 21 hours, the power-off time is 3 hours, and the cycle is 28 times. The terminal temperature is measured during the last power-on cycle, and compared with the initial measured temperature, the temperature rise value is compared with the standard requirements. After the temperature rise measurement, the current rises to the tripping current value in 5 seconds, and the circuit breaker should trip within the given/preset time. 
 
Output voltage 
Not less than AC30V, adjustable 
 
Output AC current 
AC 0.5-125A 
 
Power on time 
Power-on time 0-99h, can be preset 
 
Power off time 
0-99h can be preset 
 
Number of cycles 
0-9999 times can be preset 
 
Tripping time 
recordable 
 
Tripping current 
1.0~200A 
 
Evaluation of results 
 
 
Configuration 
  
 
Connecting cable 
Wires for temperature rise test: 1, 1.5, 2, 2.5, 4, 6 and 10, each specification has a length of 1 meter, and match 5 PCS for each specification; 16, 25, 35, and 50, each specification has a length of 2 meter, and match 5 PCS for each specification 
 
Thermocouple 
Type K, 32pcs, 2m length each pcs 
 
Temperature control in chambers 
 
 
Hardware 
Computer display greater than 18.5 in, with WIFI 
 
Threading hole 
Each workstation is equipped with threading holes for easy connection with instruments outside the box 
 
Software 
Editable program segments, capable of forming curves, generating reports, and printable 
 
Test type 
Chamber 1 
Chamber 2 
Chamber 3 
 
Delay tripping test 
√ 
√ 
√ 
 
Instantaneous tripping test 
√ 
  
  
 
Test type 
Chamber 1 
Chamber 2 
Chamber 3 
 
Temperature rise 
√ 
√ 
√ 
 
28-day test procedure 
√ 
√ 
√ 